Open navigation

2 Item(s)

per page
Set Ascending Direction

Wood protection with an 8-year warranty puts timber cladding back on the specification agenda

A long-standing debate exists in the UK on whether timber cladding needs treatment before installation.

While it is true that...

Read More

Case Study - Ffestiniog Railway Signal Box

The project called for the building of a Signal Box and Relay Room to suit the tight dimensions of the site and the requirements of Signalling and Operating departments. It was necessary that the structure would be in keeping with the heritage of the railway...Read More

2 Item(s)

per page
Set Ascending Direction
  • FSC
  • PEFC
  • Trada member
  • tdca TIMBER DECKING AND CLADDING ASSOCIATION
  • Responsible purchaser
  • Cedar Shake & Shingle Bureau
  • Secured by